{"id":772,"date":"2024-03-19T10:34:33","date_gmt":"2024-03-19T09:34:33","guid":{"rendered":"https:\/\/ko-nep.de\/szenariorahmen\/scenario-framework-2025\/"},"modified":"2026-03-24T18:38:03","modified_gmt":"2026-03-24T17:38:03","slug":"scenario-framework-2025","status":"publish","type":"szenariorahmen","link":"https:\/\/ko-nep.de\/en\/scenario-framework\/scenario-framework-2025\/","title":{"rendered":"Scenario framework 2025"},"content":{"rendered":"<div class=\"nep-beitrag-block nep-has_dl nep-block_68ec5b993378312420b4561062d30d55\">\n\n    <div class=\"nep-beitrag-head\">\n        <div>\n            <span class=\"nep-date\">30.04.2025<\/span>\n            <h4 class=\"nep-beitrag-title\">BNetzA approves scenario framework for gas and hydrogen 2025-2037\/2045<\/h4>\n        <\/div>\n        <div class=\"nep-handle\"><a href=\"#\"><\/a><\/div>\n\n    <\/div>\n\n    <div class=\"nep-beitrag-wrap\">\n        <div class=\"nep-beitrag-inhalt\">\n\n            <p>On April 30, 2025, the Federal Network Agency approved the gas and hydrogen scenario framework for the Network Development Plan 2025-2037\/2045. Together with the scenario framework for electricity, it forms the basis for coordinated planning of Germany&#8217;s energy infrastructure. <\/p>\n<p>The scenario framework contains several scenarios that reflect different developments in gas consumption, renewable energies, hydrogen use and the phase-out of natural gas. For the first time, joint assumptions for electricity and gas\/hydrogen grids are also used to enable integrated infrastructure planning. The approved scenarios now serve as the basis for the 1st draft of the Gas and Hydrogen Network Development Plan 2025-2037\/2045.  <\/p>\n<p>Further information can be found on the <a href=\"https:\/\/www.bundesnetzagentur.de\/DE\/Fachthemen\/ElektrizitaetundGas\/NEP\/Gas\/start.html\">website of the Federal Network Agency.<\/a><\/p>\n        <\/div>\n\n        <!-- Downloads -->\n                    <div class=\"nep-beitrag-dl\">\n                <span class=\"header-medium\">Downloads<\/span>\n\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/Genehm_SR_2025Gas.pdf\">\n                            Approval of the gas\/hydrogen scenario framework 2025-2037\/2045<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">PDF \/ 1 MB<\/span> -->\n\n                    <\/div>\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/Anl1_Standorte_Kraftwerke.xlsx\">\n                            Annex 1: List of locations for power plants<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">xlsx \/ 114 kB<\/span> -->\n\n                    <\/div>\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/Anl2_Kons_Elektrolyseure.xlsx\">\n                            Appendix 2: Consolidated electrolyzer list<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">xlsx \/ 34 kB<\/span> -->\n\n                    <\/div>\n                            <\/div>\n                <!-- \/Downloads -->\n        <!-- <div class=\"row nep-dl-bottom-border\"> -->\n\n\n    <\/div>\n\n<\/div>\n\n<div class=\"nep-beitrag-block nep-has_dl nep-block_12a3c90fa526dcf568b282c8ef5f4d10\">\n\n    <div class=\"nep-beitrag-head\">\n        <div>\n            <span class=\"nep-date\">02.09.2024<\/span>\n            <h4 class=\"nep-beitrag-title\">BNetzA launches consultation on gas\/hydrogen and electricity scenario frameworks<\/h4>\n        <\/div>\n        <div class=\"nep-handle\"><a href=\"#\"><\/a><\/div>\n\n    <\/div>\n\n    <div class=\"nep-beitrag-wrap\">\n        <div class=\"nep-beitrag-inhalt\">\n\n            <p>Am 01. Juli 2024 hat die Koordinierungsstelle (KO.NEP) fristgerecht den Entwurf des Szenariorahmens Gas\/Wasserstoff f\u00fcr den kommenden Netzentwicklungsplan Gas und Wasserstoff der Bundesnetzagentur zur Genehmigung vorgelegt.<\/p>\n<p>On September 2, 2024, the Federal Network Agency launched the consultation on the draft scenario frameworks for gas\/hydrogen and electricity. The consultation runs until September 30, 2024. Online events to present and discuss the scenario frameworks will take place on September 13 and 16, 2024. All information on the consultation can be found on the <a href=\"https:\/\/www.bundesnetzagentur.de\/DE\/Fachthemen\/ElektrizitaetundGas\/NEP\/start.html\" target=\"_blank\" rel=\"noopener\">BNetzA website<\/a>.<\/p>\n<p>For the first time, the two scenario frameworks are being consulted simultaneously to enable an integrated view of developments towards a climate-neutral energy system in Germany.<\/p>\n<p>The transmission system operators consider a total of four scenarios in the gas\/hydrogen scenario framework. Three scenario-based approaches, which are based on the BMWK long-term scenarios, consider the target years 2037 and 2045. A demand-oriented scenario looks at the target years 2030 and 2037.<\/p>\n<p>The Federal Network Agency will approve the scenario framework on the basis of the consultation responses. Based on the approved scenario frameworks, the transmission system operators will then determine grid expansion and conversion measures for the Gas\/Hydrogen 2025 Grid Development Plan.<\/p>\n        <\/div>\n\n        <!-- Downloads -->\n                    <div class=\"nep-beitrag-dl\">\n                <span class=\"header-medium\">Downloads<\/span>\n\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/Szenariorahmen_2025_final.pdf\">\n                            Draft scenario framework gas\/hydrogen 2025-2037\/2045 (DE)<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">PDF \/ 9 MB<\/span> -->\n\n                    <\/div>\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/Szenariorahmen_2025_final_EN.pdf\">\n                            Draft Scenario Framework Gas and Hydrogen 2025-2037\/2045 (EN)<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">PDF \/ 6 MB<\/span> -->\n\n                    <\/div>\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/SR_Anlage2Gas.xlsx\">\n                            Annex 2: Results of the market survey for hydrogen projects, incl. power-to-gas plants  <\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">xlsx \/ 1 MB<\/span> -->\n\n                    <\/div>\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/SR_Anlage3Gas.xlsx\">\n                            Appendix 3: Gas-fired power plant list <\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">xlsx \/ 181 KB<\/span> -->\n\n                    <\/div>\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/SR_Anlage4Gas.xlsx\">\n                            Annex 4: Long-term forecasts for hydrogen and methane-reducing reports from distribution system operators <\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">xlsx \/ 258 KB<\/span> -->\n\n                    <\/div>\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/2024_09_1316_BNetzA-Workshop_Szenariorahmen_GasH2_Versand.pdf\">\n                            Slides BNetzA Workshop SR Gas &amp; Hydrogen 13.\/16.09.2024 <\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">PDF \/ 4 MB<\/span> -->\n\n                    <\/div>\n                            <\/div>\n                <!-- \/Downloads -->\n        <!-- <div class=\"row nep-dl-bottom-border\"> -->\n\n\n    <\/div>\n\n<\/div>\n\n<div class=\"nep-beitrag-block  nep-block_0fd3091f4e6674d0875bef1798aa37aa\">\n\n    <div class=\"nep-beitrag-head\">\n        <div>\n            <span class=\"nep-date\">01.07.2024<\/span>\n            <h4 class=\"nep-beitrag-title\">KO.NEP submits draft scenario framework 2025 to the Federal Network Agency for approval<\/h4>\n        <\/div>\n        <div class=\"nep-handle\"><a href=\"#\"><\/a><\/div>\n\n    <\/div>\n\n    <div class=\"nep-beitrag-wrap\">\n        <div class=\"nep-beitrag-inhalt\">\n\n            <p>On July 1, 2024, the Coordination Office (KO.NEP) submitted the draft scenario framework for the upcoming Gas and Hydrogen Network Development Plan to the Federal Network Agency for approval. The Federal Network Agency is now reviewing the draft scenario framework and preparing the consultation with the public. The public, including actual or potential network users, as well as affected network operators, in particular the operators of gas distribution networks, hydrogen networks that do not constitute a transport network, other pipeline infrastructure that can be converted to hydrogen pipelines and electricity supply networks, have the opportunity to comment. The 2025 scenario framework is to be approved within six months of submission of the draft to the regulatory authority. In doing so, the regulatory authority should take into account the results of public participation.    <\/p>\n        <\/div>\n\n        <!-- Downloads -->\n                <!-- \/Downloads -->\n        <!-- <div class=\"row nep-dl-bottom-border\"> -->\n\n\n    <\/div>\n\n<\/div>\n\n<div class=\"nep-beitrag-block  nep-block_edeb3e2c1fa3e591b5a3c86f4a8e0d0d\">\n\n    <div class=\"nep-beitrag-head\">\n        <div>\n            <span class=\"nep-date\">25.03.2024<\/span>\n            <h4 class=\"nep-beitrag-title\">Market survey of infrastructure requirements: A total of 1724 project notifications received<\/h4>\n        <\/div>\n        <div class=\"nep-handle\"><a href=\"#\"><\/a><\/div>\n\n    <\/div>\n\n    <div class=\"nep-beitrag-wrap\">\n        <div class=\"nep-beitrag-inhalt\">\n\n            <p>Thank you for your interest in the Germany-wide survey of infrastructure requirements for the electricity and hydrogen grid. The market survey for hydrogen projects (WEB) received a total of 1724 project notifications. On expiry of the deadline on 22.03.2024, the reported data was write-protected and is considered reported. The registered projects remain in the associated database and can still be viewed &#8211; but not changed or deleted &#8211; by project registrants after March 22, 2024.<\/p>\n<p>The results of the market survey for hydrogen projects (WEB) are presented in the scenario framework for the Gas and Hydrogen Network Development Plan. The scenario framework is then consulted on and confirmed by the Federal Network Agency.<\/p>\n        <\/div>\n\n        <!-- Downloads -->\n                <!-- \/Downloads -->\n        <!-- <div class=\"row nep-dl-bottom-border\"> -->\n\n\n    <\/div>\n\n<\/div>\n\n<div class=\"nep-beitrag-block nep-has_dl nep-block_ef40615d7665bb6a3c8757824bcd7f65\">\n\n    <div class=\"nep-beitrag-head\">\n        <div>\n            <span class=\"nep-date\">12.02.2024<\/span>\n            <h4 class=\"nep-beitrag-title\">TSOs request capacity reservations and capacity expansion entitlements pursuant to sections 38\/39 GasNZV for storage, production and LNG facilities and power plants<\/h4>\n        <\/div>\n        <div class=\"nep-handle\"><a href=\"#\"><\/a><\/div>\n\n    <\/div>\n\n    <div class=\"nep-beitrag-wrap\">\n        <div class=\"nep-beitrag-inhalt\">\n\n            <p><strong>Preparatory work for the first integrated network development plan for gas and hydrogen 2025 continues to progress<\/strong><\/p>\n<p>According to the federal government&#8217;s draft legislation, the TSOs and the regulated operators of hydrogen transport networks must prepare the scenario framework for the first integrated gas and hydrogen network development plan by June 30, 2024. To determine the capacity requirements in the transmission system, the TSOs are now requesting capacity reservations and capacity expansion entitlements in accordance with sections 38\/39 GasNZV for storage facilities, production and LNG facilities and power plants. The aforementioned market participants are called upon to report their capacity reservations and capacity expansion claims by May 1, 2024. To this end, the TSOs have published <a href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/02\/2024_01_30_%C2%A7%C2%A7-3839_Kriterien.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">criteria<\/a> on the TSO Gas website that must also be met by May 1, 2024 in order to be included in the scenario framework.<\/p>\n<p>&nbsp;<\/p>\n<p>The TSOs explicitly point out a procedural change compared to the previous network development plan processes due to the planned new legal requirements in the Energy Industry Act on integrated network development planning for gas and hydrogen. After that, the scenario framework will no longer be consulted by the transmission system operators, but by the Federal Network Agency. In the opinion of the BNetzA, it is therefore not possible to consider inquiries received by the BNetzA during the consultation and thus after the submission of the scenario framework by the TSOs or to submit them directly to the BNetzA at a later date. Accordingly, only the requests received by May 1, 2024 can be considered in the 2024 scenario framework and the integrated gas and hydrogen network development plan 2025.<\/p>\n        <\/div>\n\n        <!-- Downloads -->\n                    <div class=\"nep-beitrag-dl\">\n                <span class=\"header-medium\">Downloads<\/span>\n\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/2024-02-12_FNB-Gas_PM-zu-Stichtag-fuer-\u00a7\u00a7-38_39-GasNZV.pdf\">\n                            PM on deadline for \u00a7\u00a7 38\/39 GasNZV<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">PDF \/ 163 kB<\/span> -->\n\n                    <\/div>\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/2024_01_30_\u00a7\u00a7-3839_Kriterien.pdf\">\n                            \u00a7\u00a7 Sections 38\/39 GasNZV Criteria<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">PDF \/ 160 kB<\/span> -->\n\n                    <\/div>\n                            <\/div>\n                <!-- \/Downloads -->\n        <!-- <div class=\"row nep-dl-bottom-border\"> -->\n\n\n    <\/div>\n\n<\/div>\n\n<div class=\"nep-beitrag-block nep-has_dl nep-block_d3b595d87c4c438b49a5e2237488d50c\">\n\n    <div class=\"nep-beitrag-head\">\n        <div>\n            <span class=\"nep-date\">07.02.2024<\/span>\n            <h4 class=\"nep-beitrag-title\">Integrated grid planning for the energy system of the future: launch of the first joint market survey by TSOs and DSOs<\/h4>\n        <\/div>\n        <div class=\"nep-handle\"><a href=\"#\"><\/a><\/div>\n\n    <\/div>\n\n    <div class=\"nep-beitrag-wrap\">\n        <div class=\"nep-beitrag-inhalt\">\n\n            <p><span data-contrast=\"auto\">The first joint survey of infrastructure requirements by the gas end electricity transmission system operators (TSOs) for the preparation of the scenario framework drafts for the electricity, gas and hydrogen network development plans starts today. <\/span><span data-ccp-props=\"{}\"> <\/span><\/p>\n<p><span data-contrast=\"auto\">The survey aims to collect information on the future production (including power-to-gas plants), feed-in, storage and use of hydrogen as well as the electricity consumption of large-scale consumers (including large-scale battery storage) of individual market participants and gas distribution system operators (DSOs). The network operators define large consumers of electricity as companies with a future connected load of 10 megawatts or more. This minimum limit does not apply to hydrogen demand notifications. Customers in the distribution network are requested to consult their network operator before submitting a hydrogen report. <\/span><span data-ccp-props=\"{}\"> <\/span><\/p>\n<p><span data-contrast=\"auto\">Market participants are called upon to report their requirements on the joint query platform by March 22, 2024: <\/span><span data-ccp-props=\"{}\"> <\/span><\/p>\n<p><a href=\"https:\/\/infrastrukturbedarf-abfrage-nep.de\/\"><span data-contrast=\"none\">https:\/\/infrastrukturbedarf-abfrage-nep.de\/<\/span><\/a><span data-ccp-props=\"{\"335551550\":2,\"335551620\":2}\"> <\/span><\/p>\n<p><span data-contrast=\"auto\">The market survey forms the basis for reliable and coordinated infrastructure planning and is a milestone for sector coupling.<\/span><span data-ccp-props=\"{}\"> <\/span><\/p>\n<p><span data-contrast=\"auto\">The network operators will present the query platform in a joint public webinar on February 14 at 2:00 pm. The experts from the TSOs will then answer questions from market participants and DSOs. Registrations for the webinar are now possible via the <\/span><a href=\"https:\/\/infrastrukturbedarf-abfrage-nep.de\/\"><span data-contrast=\"none\">query platform<\/span><\/a><span data-contrast=\"auto\"> possible. <\/span> <\/p>\n<p><span data-ccp-props=\"{\"201341983\":0,\"335559740\":259}\"><span class=\"TextRun SCXW111346292 BCX0\" lang=\"DE-DE\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW111346292 BCX0\">Further information can be found in the <\/span><\/span><a class=\"Hyperlink SCXW111346292 BCX0\" href=\"https:\/\/infrastrukturbedarf-abfrage-nep.de\/#FAQ\" target=\"_blank\" rel=\"noreferrer noopener\"><span class=\"TextRun Underlined SCXW111346292 BCX0\" lang=\"DE-DE\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW111346292 BCX0\" data-ccp-charstyle=\"Hyperlink\">FAQ<\/span><\/span><\/a><span class=\"TextRun SCXW111346292 BCX0\" lang=\"DE-DE\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW111346292 BCX0\">.<\/span><\/span><span class=\"EOP SCXW111346292 BCX0\" data-ccp-props=\"{\"201341983\":0,\"335559740\":259}\"> <\/span> <\/span><\/p>\n        <\/div>\n\n        <!-- Downloads -->\n                    <div class=\"nep-beitrag-dl\">\n                <span class=\"header-medium\">Downloads<\/span>\n\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/2024-02-07_PM_FNB-Gas_UeNB_Start-Abfrage-Infrastrukturbedarfe-NEP_final.pdf\">\n                            Press release launch market survey 2024<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">PDF \/ 152 kB<\/span> -->\n\n                    <\/div>\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/2024-01-29_PM_FNB-Gas_UeNB_Ankuendigung-Abfrage-Infrastrukturbedarfe-NEP_final.pdf\">\n                            FNB\/\u00dcNB PI Announcement market survey 29.01.<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">PDF \/ 226 kB<\/span> -->\n\n                    <\/div>\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/2024-01-29_BNetzA_Begleitschreiben-gemeinsame-Marktabfrage-UeNB-FNB.pdf\">\n                            BNetzA cover letter market survey 2024<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">PDF \/ 47 kB<\/span> -->\n\n                    <\/div>\n                            <\/div>\n                <!-- \/Downloads -->\n        <!-- <div class=\"row nep-dl-bottom-border\"> -->\n\n\n    <\/div>\n\n<\/div>\n\n<div class=\"nep-beitrag-block nep-has_dl nep-block_c0431967f4ffa38586192749544dc744\">\n\n    <div class=\"nep-beitrag-head\">\n        <div>\n            <span class=\"nep-date\">29.01.2024<\/span>\n            <h4 class=\"nep-beitrag-title\">First joint market survey by gas and electricity TSOs starts on February 7, 2024<\/h4>\n        <\/div>\n        <div class=\"nep-handle\"><a href=\"#\"><\/a><\/div>\n\n    <\/div>\n\n    <div class=\"nep-beitrag-wrap\">\n        <div class=\"nep-beitrag-inhalt\">\n\n            <p>The ambitious goals of climate neutrality by 2045 and the associated transformation of industry and the energy system require a jointly coordinated development of the infrastructures for electricity, gas and hydrogen. The comprehensive restructuring of the energy landscape is leading to numerous new projects, consumers, producers and storage facilities. In order to offer these players planning security with regard to the future energy supply, it is crucial that the electricity and gas transmission system operators (TSOs) know the specific needs of the industry. By participating in the market survey, the reporting parties also support the planning of the integrated energy system of the future.<\/p>\n<p>The TSOs are now setting a milestone for sector coupling with the first joint survey of infrastructure requirements for electricity and hydrogen. The network operators will use specially developed web applications to ask existing and potential customers about their future needs. Based on this information, the network operators can develop the corresponding infrastructure in line with demand and thus ensure a reliable energy supply for the future.<\/p>\n<p>Klaus M\u00fcller, Pr\u00e4sident der Bundesnetzagentur, unterst\u00fctzt die gemeinsame Marktabfrage als Genehmigungsbeh\u00f6rde: <em>&#8220;F\u00fcr die Netzentwicklungsplanung in den Bereichen Strom sowie Gas und Wasserstoff ist eine m\u00f6glichst genaue Prognose zuk\u00fcnftiger Entwicklungen die wichtigste Grundlage aussagekr\u00e4ftiger Ergebnisse. Die Bundesnetzagentur unterst\u00fctzt die gemeinsame Abfrage der \u00dcbertragungsnetzbetreiber und Fernleitungsnetzbetreiber ausdr\u00fccklich und m\u00f6chte f\u00fcr ein reges Feedback seitens der angesprochenen Marktteilnehmer werben. Ein \u00fcber die Plattform vereinheitlichtes und kanalisiertes Melden von Projekten hilft immens, eine robuste gemeinsame Datengrundlage zu schaffen und so die Qualit\u00e4t und Stichhaltigkeit der Netzentwicklungsplanung weiter zu verbessern.&#8221;<\/em><\/p>\n<p>In accordance with the Energy Industry Act, the TSOs are responsible for drawing up the network development plans (NDPs) for electricity, gas and hydrogen. Scenario frameworks are defined at the beginning of each NDP, with specific requirements and national energy and climate policy objectives playing a decisive role. In preparation for the preparation of the 2024 scenario framework, the TSOs will conduct the market survey with existing and potential customers from February 7, 2024 to March 22, 2024.<\/p>\n<p>The survey aims to collect information on future hydrogen production (including power-to-gas plants), storage and use as well as electricity consumption by large-scale consumers (including large-scale battery storage) of individual market participants and distribution system operators (DSOs). The network operators define large consumers of electricity as companies with a future connected load of 10 megawatts or more. Market participants are invited to report their requirements by March 22, 2024.<\/p>\n<p>At the start of the joint query platform on February 7, 2024, the TSOs will provide detailed information. In addition, TSOs and DSOs will offer a joint public webinar on February 14 at 2:00 p.m. to answer questions from market participants and DSOs. Registrations are possible from February 7 via the query platform.<\/p>\n        <\/div>\n\n        <!-- Downloads -->\n                    <div class=\"nep-beitrag-dl\">\n                <span class=\"header-medium\">Downloads<\/span>\n\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/2024-01-29_PM_FNB-Gas_UeNB_Ankuendigung-Abfrage-Infrastrukturbedarfe-NEP_final.pdf\">\n                            FNB\/\u00dcNB PI Announcement market survey 29.01.<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">PDF \/ 226 kB<\/span> -->\n\n                    <\/div>\n                                    \n                    <div class=\"nep-dl-item\">\n                        <a target=\"_blank\" href=\"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/03\/2024-01-29_BNetzA_Begleitschreiben-gemeinsame-Marktabfrage-UeNB-FNB.pdf\">\n                            BNetzA cover letter market survey 2024<\/b>\n                        <\/a>\n                        <!-- <span class=\"nep-beschriftung\">PDF \/ 47 kB<\/span> -->\n\n                    <\/div>\n                            <\/div>\n                <!-- \/Downloads -->\n        <!-- <div class=\"row nep-dl-bottom-border\"> -->\n\n\n    <\/div>\n\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":0,"parent":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-772","szenariorahmen","type-szenariorahmen","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Scenario framework 2025 - KO\u00b7NEP<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ko-nep.de\/en\/scenario-framework\/scenario-framework-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Scenario framework 2025 - KO\u00b7NEP\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ko-nep.de\/en\/scenario-framework\/scenario-framework-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"KO\u00b7NEP\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-24T17:38:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/scenario-framework\\\/scenario-framework-2025\\\/\",\"url\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/scenario-framework\\\/scenario-framework-2025\\\/\",\"name\":\"Scenario framework 2025 - KO\u00b7NEP\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/#website\"},\"datePublished\":\"2024-03-19T09:34:33+00:00\",\"dateModified\":\"2026-03-24T17:38:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/scenario-framework\\\/scenario-framework-2025\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ko-nep.de\\\/en\\\/scenario-framework\\\/scenario-framework-2025\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/scenario-framework\\\/scenario-framework-2025\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Scenario framework 2025\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/\",\"name\":\"KO\u00b7NEP\",\"description\":\"Koordinierungsstelle Netzentwicklungsplanung f\u00fcr Gas und Wasserstoff\",\"publisher\":{\"@id\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/#organization\",\"name\":\"KO\u00b7NEP\",\"url\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ko-nep.de\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Logo-KONEP.png\",\"contentUrl\":\"https:\\\/\\\/ko-nep.de\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Logo-KONEP.png\",\"width\":1402,\"height\":312,\"caption\":\"KO\u00b7NEP\"},\"image\":{\"@id\":\"https:\\\/\\\/ko-nep.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Scenario framework 2025 - KO\u00b7NEP","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ko-nep.de\/en\/scenario-framework\/scenario-framework-2025\/","og_locale":"en_US","og_type":"article","og_title":"Scenario framework 2025 - KO\u00b7NEP","og_url":"https:\/\/ko-nep.de\/en\/scenario-framework\/scenario-framework-2025\/","og_site_name":"KO\u00b7NEP","article_modified_time":"2026-03-24T17:38:03+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ko-nep.de\/en\/scenario-framework\/scenario-framework-2025\/","url":"https:\/\/ko-nep.de\/en\/scenario-framework\/scenario-framework-2025\/","name":"Scenario framework 2025 - KO\u00b7NEP","isPartOf":{"@id":"https:\/\/ko-nep.de\/en\/#website"},"datePublished":"2024-03-19T09:34:33+00:00","dateModified":"2026-03-24T17:38:03+00:00","breadcrumb":{"@id":"https:\/\/ko-nep.de\/en\/scenario-framework\/scenario-framework-2025\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ko-nep.de\/en\/scenario-framework\/scenario-framework-2025\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ko-nep.de\/en\/scenario-framework\/scenario-framework-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ko-nep.de\/en\/"},{"@type":"ListItem","position":2,"name":"Scenario framework 2025"}]},{"@type":"WebSite","@id":"https:\/\/ko-nep.de\/en\/#website","url":"https:\/\/ko-nep.de\/en\/","name":"KO\u00b7NEP","description":"Koordinierungsstelle Netzentwicklungsplanung f\u00fcr Gas und Wasserstoff","publisher":{"@id":"https:\/\/ko-nep.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ko-nep.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ko-nep.de\/en\/#organization","name":"KO\u00b7NEP","url":"https:\/\/ko-nep.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ko-nep.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/04\/Logo-KONEP.png","contentUrl":"https:\/\/ko-nep.de\/wp-content\/uploads\/2024\/04\/Logo-KONEP.png","width":1402,"height":312,"caption":"KO\u00b7NEP"},"image":{"@id":"https:\/\/ko-nep.de\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/ko-nep.de\/en\/wp-json\/wp\/v2\/szenariorahmen\/772","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ko-nep.de\/en\/wp-json\/wp\/v2\/szenariorahmen"}],"about":[{"href":"https:\/\/ko-nep.de\/en\/wp-json\/wp\/v2\/types\/szenariorahmen"}],"version-history":[{"count":20,"href":"https:\/\/ko-nep.de\/en\/wp-json\/wp\/v2\/szenariorahmen\/772\/revisions"}],"predecessor-version":[{"id":1898,"href":"https:\/\/ko-nep.de\/en\/wp-json\/wp\/v2\/szenariorahmen\/772\/revisions\/1898"}],"wp:attachment":[{"href":"https:\/\/ko-nep.de\/en\/wp-json\/wp\/v2\/media?parent=772"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}